    Terminal 5 was an absolute masterclass in how to deliver a megaproject.
    HS2 is, unfortunately, just another magnitude of complexity. Some of it avoidable, some of it was going to be a pain no matter how much was planned.

    It also doesn’t help that HS2 got massively underestimated to get political approval and shovels in the ground. (The flipside being, if it had gone with realistic estimates, it could well have been stuck in committee for until 2050)

    • Denjin@lemmings.world
      link
      fedilink
      English
      arrow-up
      5
      ·
      7 days ago

      They should have started in Leeds. Not start in London and give themselves a convenient way out.

      • ohulancutash@feddit.uk
        link
        fedilink
        English
        arrow-up
        1
        ·
        7 days ago

        The most complex and time-consuming engineering is required in London. That’s why it had to start there.

        • Denjin@lemmings.world
          link
          fedilink
          English
          arrow-up
          1
          ·
          6 days ago

          So now that the project is abandoned, they’ve spent the most money and caused the biggest disruption for the smallest benefit.

          If they started at the other end, the stated goal of the project, they wouldn’t have the get out clause they have by starting in London.